Chapter 3 ________________________________________________________________ Installation
VAISALA________________________________________________________________________ 35
to be welded
ø89.5 + 0.5
lengthening
piece
inner plate of th
e
process wall
wall thickness
< 160
plate ring plate pipe
the flange is fixed
with screws or by
spot welding
cooling
profile
~45º
ø118
NOTE:
Make sure that
the cooling profile
does not cover the
locking screws
0604-025
Figure 23 Installing Probe Through Thick Walls
Probe and Cooling Set Mounting with Process Shut Down
- Complete the entire mounting process as instructed on page 33.
Probe and Cooling Set Mounting with Process Running
- First mount the cooling element (and fins) to warm it up; tightly
plug the hole for the probe in the cooling element for the duration
of the warmup period.
- After a few hours, complete the installation by installing the probe.
This procedure should lessen the amount of condensation that builds
up in the hole.
Removing Transmitter for Maintenance
- If you remove the transmitter from the process to send it to service
etc., leaving the cooling set in its place, make sure you plug tightly
the hole for the probe in the cooling element. This will lessen the
amount of condensation that builds up in the hole.